Winter Shutdown Projects: Why December Is the Perfect Time for Industrial Painting

Posted Dec 15, 2025 by Dave Scaturro

 Winter Shutdown Projects: Why December Is the Perfect Time for Industrial Painting

For a lot of industrial facilities, December means one thing—production slows down, if not stops altogether. Between holiday schedules, reduced orders, and planned maintenance windows, it’s one of the rare times you can get into areas that are usually off-limits during peak operations.

And if you’ve been putting off that industrial painting project all year? This is your golden window to get it done without messing with productivity.


Why December Works

1. Less Disruption
When the machines are quiet and the crews are light, we can move faster, safer, and with fewer workarounds. No need to section off active production zones or dodge forklift traffic every five minutes.

2. Better Access
Overhead steel, catwalks, tanks, and confined spaces are much easier to access when you don’t have to work around daily operations. We can bring in lifts, scaffolding, and containment without impacting workflow.

3. Strategic Timing
Get the work done now, and you start the new year with a facility that’s in top shape—coatings fresh, corrosion under control, and no backlog of maintenance eating into 2026 budgets.


But What About the Cold?

Here’s the thing—modern coating systems aren’t like the old days when you had to wait for warm, dry weather. We use moisture-cured urethanes, low-temperature epoxies, and quick-cure industrial enamels that perform even in winter conditions. And in sensitive areas, we can control temperature and humidity with temporary enclosures and heaters.


Projects Perfect for a Winter Shutdown

  • Structural Steel Recoating – Stop corrosion before it gets worse.

  • Tank & Silo Painting – Interior or exterior, without disrupting production.

  • Floor Coatings & Line Striping – Recoat forklift lanes or apply slip-resistant finishes without shutting down workflow.

  • Equipment Painting – Freshen up machinery while it’s offline for maintenance.


Real-World Example

Last December, we worked with a manufacturing plant in Middlesex County during their 10-day holiday shutdown. We tackled overhead steel that hadn’t been recoated in 12 years, recoated two storage tanks, and re-striped all warehouse lanes. When the crews came back in January, everything was ready to go—and the client avoided the nightmare of trying to do all that work during busy season.


Bottom Line

December downtime is a gift. Use it to knock out industrial painting and maintenance that’s been hanging over your head all year. With the right crew, coatings, and planning, winter shutdowns can be the most productive stretch of your year.


Got a holiday shutdown on the calendar?
Contact Alpine Painting & Sandblasting Contractors now to lock in your project. We’ll get it done while your operation rests—so you can start 2026 ahead of the game.

Michael Street
Schedule an Estimate

Call Michael Street, Shop Manager, at (973) 279-3200 x222 or use our online application

Get Started

Year-End Safety Check: Industrial Coatings and OSHA Compliance

 Year-End Safety Check: Industrial Coatings and OSHA Compliance

Posted Dec 22

Winter Shutdown Projects: Why December Is the Perfect Time for Industrial Painting

 Winter Shutdown Projects: Why December Is the Perfect Time for Industrial Painting

Posted Dec 15

Alpine Painting Celebrates 50 Years with Golden Anniversary Holiday Dinner in Paterson, NJ

 Alpine Painting Celebrates 50 Years with Golden Anniversary Holiday Dinner in Paterson, NJ

Posted Dec 15

Facility Maintenance Planning for 2026: Where to Start

 Facility Maintenance Planning for 2026: Where to Start

Posted Dec 08

Cold Weather Coatings: How We Keep Projects Moving in Winter Conditions

 Cold Weather Coatings: How We Keep Projects Moving in Winter Conditions

Posted Dec 01

Request an Estimate