Blog

SHARE
Facebook Share Twitter Share LinkedIn Share

Alpine Paints the Great Falls Historic District Sign of the Paterson Museum Building

Posted Jun 26, 2015 by Dave Scaturro

The key to properly painting a historic structure is capturing the essence and ambiance of when it was first built. To Alpine this means bringing the figure or building back to life, but with its original sparkle. With over 40 years of experience in Historic Restoration, Alpine understands just what kind of research and communication it takes tackling such a project. Just recently, Alpine was awarded the job of cleaning, preparing, priming and painting the exterior “Great Falls Historic District” wall sign of the Paterson Museum Building owned and preserved by the Paterson Historic Preservation Commission.

We were honored to be awarded the job and we hope the Historic Preservation Commission is as pleased as we are with how it turned out!

Thank you to all that made this project possible, including the Paterson Historic Preservation Commission (Kelly Ruffel & Gianfranco Archimede) Ken Simpson (Chariman of the Historic Preservation Commission and Supervisor of Passiac County) and Mohammed Ahmed for helping spearhead this project.

Michael Street
Schedule an Estimate

Call Michael Street, Shop Manager, at (973) 279-3200 x232 or use our online application

Get Started

What is the ABC STEP Platinum Award and what does it mean for your job site?

 What is the ABC STEP Platinum Award and what does it mean for your job site?

Posted Jul 27

Why your welding contractor and your painting contractor should be the same company

 Why your welding contractor and your painting contractor should be the same company

Posted Jul 20

How to coat a water treatment facility: NSF certification, surface prep, and system selection explained

 How to coat a water treatment facility: NSF certification, surface prep, and system selection explained

Posted Jul 13

Epoxy vs urethane vs zinc-rich coatings: which protective system is right for your facility?

 Epoxy vs urethane vs zinc-rich coatings: which protective system is right for your facility?

Posted Jul 06

What Can Be Completed During a One to Two Week Facility Shutdown in New Jersey, New York, and Pennsylvania

 What Can Be Completed During a One to Two Week Facility Shutdown in New Jersey, New York, and Pennsylvania

Posted Jun 22

Get the Right Team on Your Project from the Start

Every project comes with different requirements, timelines, and conditions. Speak directly with an experienced estimator or project manager to review your scope and determine the right approach. 

Or call (866) 596-0349 to speak with the team.

Request an Estimate